GC1 - Public Service Commission
Welcome Guest| Sign In | Register

GC1

Gas Operator: ALBANY WATER GAS & LIGHT COMMISSION
Title: INSTALL 4 IN. PLASTIC GAS MAIN
Submitted By: CITY OF ALBANY WG&L
Date Submitted: 11/14/2019 3:52 PM
Home State: Georgia
Home County: Dougherty
Certificate Number:
Construction Type: New Construction
1 Pipeline Length: 5,600 ft
Pipeline Diameter: More than 2" to 4"
Pipeline Type: Plastic
Pressure: 45 psig
Start Date: 11/20/2019
End Date: 11/26/2019
Comments:
2Affected Counties: Lee
3 Estimated 
Pipeline Length:
Feet: 5651.75488973358
Yards: 1883.91829657786
Miles: 1.07040812101974
Meters: 1722.65488777236
Kilometers: 1.72265488777236
1 Pipeline Length is submitted by the user.
2 Affected Counties are the counties construction is taking place.
3 Estimated Pipeline Length is calculated by the system based on the pipeline drawn on the map.